![]() |
||||
![]() |
||||
To ensure all weather surfaces give all year round performance, a winterisation programme should be followed. This will ensure the following :-
Our specialist snow shunting equipment is fully height adjustable. It grades off snow cover on the playing surface, removing it to the perimeter of the pitch (within an area of 1m to 1.5m) With regard to the shunting equipment, due to height adjustability it does not remove infill from the carpet pile. Also, the equipment avoids any stress on seams and inlaid lines. The equipment will not cause any damage to the sub base. Once snow is removed we can apply PDV Sodium Chloride to the surface to ensure that it remains frost free. Normally 1-5 to 2 tones of PDV is required for a full-sized pitch. |
|
|||
| © Sports Maintenance Services 2011 | ||||